Mc-techgroup SP2000H_DIL_BR Operator's manual Manual de usuario Pagina 27

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 35
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 26
27
Gas sampling and gas conditioning technology 2-1.1.7-ME
16.2 DISMANTLING THE DILUTION CROSS
Figure 11 shows an exploded drawing of the dilution unit.
Nut 1
Nut 2
Nut 3
Nut 4
Nut 5
Nut 6
Critical orifice
Mark
Injector
Mark
Mark
Tube sample gas
out
Block
180°C Version
O-rings
Figure 13 Exploded drawing of dilution unit
The following step-by-step procedure is recommended:
Remove probe insulating cover (see 16.1).
Loosen knurled screw for fixing heat conducting plates.
Remove heat conducting plates.
Remove all pipe connections on dilution unit (crosspiece). These are:
- vacuum pressure gauge nut 6
- dilution gas inlet nut 4
- sample gas outlet nut 5 (remove sample gas out pipe at upper elbow union. Do not remove
pipe connected to crosspiece)
- nut 1.
W A R N I N G !
Do not remove nut 2 until the dilution cross is removed from the
probe or the orifice will be broken !
The dilution cross is now ready for further maintenance and repair work.
Vista de pagina 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 33 34 35

Comentarios a estos manuales

Sin comentarios