
8
Gas sampling and gas conditioning technology 10-1.1.1-ME
Gas conditioning section:
The second cleaning stage are two mol sieve columns removing CO
2
and moisture (Fl2 and FI3)
being switched and purged resp. regenerated cyclical.
The inlet pressure is 70 - 145 psig. The manometer P1 on the front plate of the BA-C enables the
optical control of the inlet pressure.
The cleaned air is available at the outlet 2. Here a connector G ¼“ i provided by customer can be
mounted.
If the inlet pressure drops to a value below 73 psi or the catalyst temperature falls below 914°F the
gas flow is switched off.
8 TECHNICAL DATA
Combustion Air Conditioning Unit
Instr. air 73 psi up to 145 psi
Platinum/Paladium on Al
2
O
3
-Support
Contamination of catalyst
Halogene, silicon, lead, phosphoric substances
< 75 % avoid condensation
Power supply / Power consumption
Mains cable 3x 1,5² 3 m length with cable end contact
Status cable 2x 0,75² 3m length with cable end contact
Status contact output
for pressure and temperature
1 NO contact - potential free, max . 24V,
1A
19" housing 6 U (HE), depth 375 mm
Approx. 70db(A) cyclic 5min
Electrical equipment standard
Comentarios a estos manuales